Mandolin Guy wrote:
I was wondering just how long a generator should run before a load is applied and when the load should be removed prior to shutting it down.
Over the years, I've allowed about 5 minutes before turning anything on. By the same token, I've turned everything off about 5 minutes before shutting the generator down.
I know it's not good to apply a load immediately but I'm wondering if 5 minutes on either end is too much or too little. I figure I read it somewhere but I just don't remember. I've just always tried to stick with the 5 minute rule.
It's an Onan, 4K, NGE, 2 cylinder